Lötschberg

The centrepiece of our infrastructure is the Lötschberg axis.

Our topics
Doppelspurausbau Lötschberg-Basistunnel
BLS is upgrading the Lötschberg Base Tunnel

The Lötschberg Base Tunnel is the centrepiece of the BLS infrastructure and a central element of the NRLA, the New Rail Link through the Alps. However, the Lötschberg Base Tunnel is also a bottleneck because two thirds of the tunnel can only be accessed via one rail tube. At the beginning of 2024, BLS got the green light to expand the full length of the tunnel to two tubes. This will finally complete the construction.

More
Private guided group tour
Lötschberg Base Tunnel

Masterpiece of railway engineering

Visit
Construction projects & maintenance work
Bauarbeiten im Tunnel im Sommer 2019
New track in the Lötschberg Summit Tunnel

Investing in the future: The tracks in the Lötschberg Summit Tunnel were last replaced in the 1970s. Over the past six years, BLS has invested in a modern and sustainable track so that the travellers can continue to travel conveniently through the tunnel between Goppenstein and Kandersteg.

More
Completed construction projects
Refurbishing of the eastern bore of the Lötschberg Base Tunnel
More
Newsletter
Download PDF
0 of 0 Media files